The project aims to modify the existing pipework connection at Snowy Hydro Power Station,
Laverton from and unpiggable to a piggable pipeline.
The works include; locating the existing pipeline and conducting civil works preparation and
excavation in preparation for the installation of piping at either end of the future piggable section.
Following exposing the line coating removal and pipeline cut out is conducted to enable installation
and on site welding of the newly constructed pig launcher and receiver.
Following installation and NDT in accordance with AS2885, the pipeline and pig traps were
commissioned to be used for pigging at a later date.