National Australian Pipelines was engaged by APA Group to conduct; excavation, integrity assessment, recoating and backfill of the T60 pipeline due to the impact of a future residential waterway and road development in Officer VIC.
The future water weir and road due to be built by the proponent will cross the existing T60 Longford to Dandenong transmission pipeline at a 90 degree angle.
As a direct result of the roadway and waterway development, APA requires further asset integrity and protection prior to the works commencing.
