National Australian Pipelines was engaged by APA Group to conduct; excavation, integrity assessment, recoating, concrete slabbing installation and backfill of the T1 pipeline due to the impact of a future residential development in Clyde North VIC.
Multiple road crossings identified as part of the Honour Village development required a review of the proposed design and a requirement to ensure adequate pipeline protection for the T1 Pipeline from future works.
The area of pipeline impact encompassed the full width of the future road reserve boundary, approximately 58m long.
