National Australian Pipelines were engaged by Ausnet Services to design and construct approximately 3.8km of DN200 transmission steel gas pipeline as part of the Waurn Ponds Network Augmentation.
Due to steady growth in the Torquay and Jan Juc area, additional infrastructure was required to secure future gas supply reliability.
The new 200mm diameter pipeline, was constructed to extend the existing 250mm TP (Licence PL99) Pipeline from the Ghazepore Rd Railway, South terminating near Anglesea Rd.
Two new Pressure regulators were installed and commissioned as part of the works, at the end of the newly built transmission pipeline.
These regulators will become future off takes and are tied back into the existing HP2 and HP1 reticulation network.