National Australian Pipelines were engaged by APA Group to construct the Aurora Lane Pipeline Extension.
The works included approximately 205m of DN100 steel high pressure gas pipeline extension to be utilised to supply the Mayfield Lane development.
The pipeline was fully installed in the Aurora Lane roadway and reinstated in accordance with APA and council requirements.
