Werribee Recycled Water Scheme

Client :

Melbourne-Water

Project Date

2002

Length

5km

Pipe Diameter & Type

600mm to 150mm DICL & MSCL

The Werribee Recycled Water involved the construction of 5km of 600mm to 150mm diameter ductile iron and mild steel pipeline for Melbourne Water.

The Werribee Recycled Water involved the construction of 5km of 600mm to 150mm diameter ductile
iron and mild steel pipeline for Melbourne Water.

Major activities

Major activities undertaken for this project included:

Crossing the Werribee River.
Crossing the main Melbourne Outfall Sewer.
Construction of two dams.
Construction of two Pump Stations (one below ground).