The Tyabb Transmission Gas Duplication Main involved construction of 5.4 km’s of 200mm Steel High Pressure Transmission Pipeline along the Mornington – Tyabb Road.
2007
5.4 kms
200mm Steel Pipe
The Tyabb Transmission Gas Duplication Main involved construction of 5.4 km’s of 200mm Steel High Pressure Transmission Pipeline along the Mornington – Tyabb Road.
Major activities undertaken for this project included: