Construction of approx. 1,000M of DN300 Steel high pressure gas pipeline for APA group as part of the Melbourne Metro Rail enabling works. Pipeline installation included construction of DN300 pipeline on Flemington Road (night works) and a 180m horizontal directional drill underneath the Haymarket roundabout. Works also included 10 cut and caps to decommission existing gas mains in Grattan Street with pipe sizes ranging between DN450 and DN100. National Australian Pipelines also installed various short sections of steel and poly pipe work ranging between DN180 and DN63 to maintain gas supply to Melbourne University and the Parkville hospital precinct. Commissioning of the new gas lines and capping of existing lines included a number of hot-taps and live welding works to ensure supply was maintained throughout the construction operation. The construction of the gas pipelines in the metro area resulted in crossing over existing services and interfacing with a number of stakeholders and other contractors.