In 2014 National Australian Pipelines constructed a dual trench pipeline containing gas and water
mains in order to supply the Donnybrook Road Merrifield Estate. The gas main was a 3.6km, 300mm
diameter MSCL pipeline. The pipeline was constructed for APA Group to meet transmission gas main
standards in order to ensure the integrity of the service. A 3.6km water main was also constructed in
the same trench as the gas main in order to reduce costs for the respective clients. The water main was a 300mm MSCL pipeline constructed for the Mickleham Delivery Pty Ltd & Evolve, DCE and to be operated by Yarra Valley Water.