The Boundary Road Feeder Main project conducted for Barwon Water Alliance involved the construction of the water main at Boundary Road Grovedale, between Ghazepore Road in Waurn Ponds and Charlemont Road in Connewarre. The pipeline in total was 4.5Km long, comprising of 477m of 960mm, 2,483m of 813mm and 1,605m of 648mm MSCL pipe.
