Bellarine TM Duplication

Client :

Barwon-Water

Project Date

2001

Length

12km

Pipe Diameter & Type

960mm MSCL

The Bellarine TM Duplication involved the construction of a 12km long, 960mm diameter MSCL pipeline for Barwon Water.

The Bellarine TM Duplication involved the construction of a 12km long, 960mm diameter MSCL pipeline for Barwon Water.

Major activities

Major activities undertaken for this project included:

Open cut crossing the Barwon River and all environmental issues associated with it. This part of the project involved pre-fabricating 60 Tons of pipe structure and then launching this into the river.
Due to unforseen flooding, we conducted emergency procedures to secure the pre-fabricated steel structures and prevent them from being washed in to the sea. We also conducted this task as soon as we received a flood alert from Barwon Water.
We also conducted massive amounts of dewatering using multiple pumps on the principal’s request.
This project involved the construction of two underground concrete pits (50 Tons each), which were precast offsite, transported and delivered to the tie-in locations.
Another critical task in this project was working parallel to high voltage power lines.
GALLERY

View photos of our team in action

View photos of the work undertaken for this project: Bellarine TM Duplication