George Street Feeder Main

Client :

Barwon-Water

Project Date

2008

Length

660 meters MSCL

Pipe Diameter & Type

1.4 km

This contract involved the construction and replacement of approximately 1.4 km of 660mm diameter MSCL pipe.

This contract involved the construction and replacement of approximately 1.4 km of 660mm diameter MSCL pipe. The pipe was laid along Elizabeth Street, Autumn Street, George Street, and Aphrasia Street.

Major activities

Major activities undertaken for this project included:

Installation of pipelines along residential roads in Geelong.
Managing School traffic, vehicle traffic and pedestrian traffic.
Maintaining access at all times to properties.
Major road reinstatement to council / VicRoads standards.
Construction of DN600 stop valve and bypass.
Tie-ins to existing mains.